PA NORTHCENTRAL REGION -
NSCD/FGM PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| # |
Project or Stream Name |
Reach or Phase |
Reach Length (Feet) |
Project Status |
Watershed |
County(ies) |
DEP Manager |
DEP Permit # |
Primary Sponsor/Permittee |
Funding Source(s) |
Total Grant Funds |
Project Features |
Design |
Construction |
Year Built |
Reference Reach |
Web Links |
Project or Stream Name |
| 1 |
Antes Creek |
N/A |
|
Phase I; Assessment |
10A |
Lycoming |
Sattler |
N/A |
Greater Nippenose WA |
Unknown |
|
Unknown |
N/A |
N/A |
N/A |
N/A |
None |
Antes Creek |
| 2 |
Bentley Creek |
Reaches I-V |
26,928 |
Phases I-IV; Massive Failure*; Rebuilt in 2000 |
04B |
Bradford, Chemung (NY) |
Means |
No Permit Issued; USFWS Project |
Bentley
Creek WA |
GG 1999, 2000, 2002; EPA 319 |
$300,000 |
CV, JH, WW |
USFWS |
Unknown |
1998 |
Bentley Creek, Bradford County |
None |
Bentley Creek (Reach I-V) |
| 3 |
Big Bear Creek Watershed Restoration Project |
Reaches I-III |
18,375 |
Phases I-IV; Moderate Failure*; Rebuilt Twice |
10B |
Lycoming |
Sattler |
No Permit Issued, USFWS Project |
Dunwoody Club |
GG 1999, 2003; WRAP |
$600,000 |
CV, JH, LV, RW, FM |
USFWS |
Gleim Environmental; USFWS |
1999-2000 |
Ellen Run, Tioga County |
None |
Big Bear Creek Watershed Restoration Project (Reach I-III) |
| 4 |
Black Hole Creek |
N/A |
|
Phase I; Assessment |
10C |
Lycoming |
Sattler |
N/A |
Black Hole Creek WA & Montgomery Borough |
GG 2002, 2004 |
$33,675 |
N/A |
N/A |
N/A |
N/A |
N/A |
None |
Black Hole Creek |
| 5 |
Buffalo Run Stream Restoration Project |
Reaches I-IV |
600 |
Phases I-IV; Completed; Some Failure* |
09C |
Centre |
Sattler |
E14-394 |
Trout Unlimited,
Spring Creek Chapter |
Unknown |
$102,000 |
CV, JH, RW, BE, RB, FH |
Land Studies |
Unknown |
2001 |
Unknown |
None |
Buffalo Run Stream Restoration Project (Reach I-IV) |
| 6 |
Buffalo Creek |
N/A |
|
Phase I; Assessment |
10C |
Union |
Sattler |
N/A |
Buffalo Creek WA |
GG 2001, 2002, 2003 |
$54,801 |
N/A |
N/A |
N/A |
N/A |
N/A |
None |
Buffalo Creek |
| 7 |
Cory Creek A, C, D, E |
Reaches A, C, D, E |
|
Phases I-II; Need Funding for Design |
04A |
Tioga |
Means |
E59-455 |
Corey Creek WA |
GG 2002, 2004 |
|
Unknown |
Skelly & Loy |
Unknown |
Unknown |
Mad Run |
None |
Cory Creek, Reaches A, C, D, E |
| 8 |
Cory Creek B |
Reach B |
1,345 |
Phases I-III; Construction in 2005 |
04A |
Tioga |
Means |
E59-455 |
Corey Creek WA |
GG 2002, 2004 |
|
LV, CV, RW |
Skelly & Loy |
Unknown |
Unknown |
Mill Creek |
None |
Cory Creek, Reach B |
| 9 |
Elk Run Restoration Project |
N/A |
|
Phases I-IV; Condition Unknown |
09A |
Tioga |
Means |
Permit Status Unknown |
Gaines Township, USFWS |
GG 2000, 2001 |
|
Unknown |
USFWS, Gannett Fleming |
Unknown |
2001 |
Unknown |
None |
Elk Run Restoration Project |
| 10 |
Ellen Run Restoration Project |
N/A |
1,006 |
Phases I-IV; Successful |
04A |
Tioga |
Means |
E59-439 |
Mansfield Boro |
GG |
$574,000 |
CV, JH, RW, RB, FH |
Skelly & Loy |
Unknown |
2004 |
Mad Run |
Ellen Run |
Ellen Run Restoration Project |
| 11 |
Fishing Creek, Kocher Park Project |
N/A |
1,800 |
Phases I-IV; Some Failure*, Needs $70K Repair |
07E |
Columba |
Sattler |
No Permit Issued; USFWS Project; E19-242 |
Fishing Creek WA |
GG |
|
CV, JH, RW, RB |
USFWS, Larsen Design |
Unknown |
2004 |
Unknown |
None |
Fishing Creek, Kocher Park Project |
| 12 |
Fishing Creek, Camp Lavigne Project |
N/A |
|
Phases I-III; Construction in 2005 |
07E |
Columbia |
Sattler |
Permit Issued or Pending |
Boy
Scouts of America (BSA) |
GG |
|
Unknown |
Larsen Design |
N/A |
N/A |
N/A |
None |
Fishing Creek, Camp Lavigne Project |
| 13 |
Kettle Creek, Headgate Project |
N/A |
|
Phases I-IV; Condition Unknown |
09B |
Clinton, Potter, Tioga |
Means |
E53-376 |
Kettle Creek WA, Trout
Unlimited |
GG |
$100,000 |
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Kettle Creek, Headgate Project |
| 14 |
Kettle Creek |
N/A |
|
Phases I-IV; Some Failure* |
09B |
Clinton, Potter, Tioga |
Means |
None |
Kettle Creek WA, Trout
Unlimited |
GG 1999, 2000 |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Kettle Creek |
| 15 |
Kettle Creek, Cross Fork |
N/A |
|
Phases I-III; Design |
09B |
Clinton, Potter, Tioga |
Means |
None |
Kettle Creek WA, Trout
Unlimited |
No GG |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Kettle Creek, Cross Fork |
| 16 |
Lanning Creek |
N/A |
|
Phases I-III; Design |
04D |
Bradford |
Means |
None |
Lanning Creek WA |
GG 2002 |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Lanning Creek |
| 17 |
Laurel Run & Oliver Run Stream Relocation Project |
N/A |
|
Phases I-III; Some Failure* |
11B |
Centre |
Sattler |
None |
Unknown |
Unknown |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Laurel Run & Oliver Run Stream Relocation Project |
| 18 |
Limestone Run |
N/A |
|
Need Funding for FGM |
10D |
Northumberland |
Sattler |
None |
Unknown |
No GG for FGM |
|
Unknown |
Unknown |
Unknown |
Unknown |
GG $23,900 |
None |
Limestone Run |
| 19 |
Lycoming Creek |
N/A |
|
Phase I, Rosgen II underway |
10A |
Lycoming |
Sattler |
None |
Lycoming Creek WA |
GG |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Lycoming Creek |
| 20 |
Mahoning Creek Demonstration Project |
N/A |
|
Phases I-III; Construction in 2005 |
05E |
Montour |
Sattler |
Permit Status Unknown |
Unknown |
Unknown |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Mahoning Creek Demonstration Project |
| 21 |
Mill Creek |
N/A |
|
Phases I-IV |
04C |
Bradford |
Means |
E08-399 & E08400; Split Project |
Bradford
County CD |
GG |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Mill Creek |
| 22 |
Millers Run Restoration |
N/A |
|
Phases I-IV, Complete Failure*, Rebuilding 2005 |
10B |
Lycoming |
Sattler |
E41-499 |
Loyalsock Township |
GG 2001, 2004; FEMA 2005 |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Millers Run Restoration |
| 23 |
Muncy Creek, Gavitt Site Demonstration Project |
N/A |
500 |
Phases I-IV, Moderate Failure*, Rebuilt 2005 |
10D |
Sullivan |
Sattler |
E57-098 |
Muncy Creek WA |
GG 2000 |
$22,528 |
CV, RV, JH |
Larsen Design |
Unknown |
2002 |
None Used |
None |
Muncy Creek, Gavitt Site Demonstration Project |
| 24 |
Muncy Creek, Nordmont to Sonestown Project (Headwaters) |
N/A |
5,280 |
Phases I-III, Construction in 2005 |
10D |
Sullivan |
Sattler |
E57-105, Permit Pending |
Muncy Creek WA |
GG 2001 |
$380,500 |
CV, LV, JH |
Larsen Design |
Unknown |
N/A |
Grays Run, Lycoming County |
None |
Muncy Creek, Nordmont to Sonestown Project (Headwaters) |
| 25 |
Satterlee Creek, Athens Twp |
N/A |
|
Phases I-III; NSCD Demo Project Planned |
04B |
Bradford |
Means |
None |
Athens Twp |
GG 1999, 2001, 2003 |
$220,500 |
N/A |
Unknown |
N/A |
N/A |
Unknown |
None |
Satterlee Creek, Athens Twp |
| 26 |
Sinnemahoning Creek, Bennett Branch Demo Project |
N/A |
|
Phases I-IV, Successful |
08A |
Cameron |
Means |
No Permit Issued; USFWS Project |
Bennett Branch WA & CVI |
GG 1999, CVI 1999 |
$220,000 |
Unknown |
USFWS, Gannett Fleming |
Unknown |
2001 |
Unknown |
Bennett
Branch |
Sinnemahoning Creek, Bennett Branch Demo Project |
| 27 |
Sinnemahoning Creek, Clear Creek Tributary, Venture Site |
N/A |
1,000 |
Phases I-III, Construction in 2005 |
08A |
Cameron |
Means |
E12-148 |
Cameron County CD |
GG 2002, 2003 |
$225,000 |
CV, JH, FM |
Gannett Fleming |
Unknown |
N/A |
Sinnemahoning Creek |
None |
Sinnemahoning Creek, Clear Creek Tributary, Venture Site |
| 28 |
Sinnemahoning Creek, Driftwood Branch, Schatz Site |
N/A |
500 |
Phases I-III, Construction in 2005 |
08A |
Cameron |
Means |
E12-148 |
Cameron County CD |
GG 2004 |
$55,000 |
CV, JH, FM |
Gannett Fleming |
Unknown |
N/A |
Sinnemahoning Creek |
None |
Sinnemahoning Creek, Driftwood Branch, Schatz Site |
| 29 |
Spring Creek, Tributary to Slab Cabin Run |
N/A |
|
Phases I-IV; Current Condition Unknown |
09C |
Centre |
Sattler |
Permit Status Unknown |
Penn State University (PSU) |
319 |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Spring Creek, Tributary to Slab Cabin Run |
| 30 |
Sugar Creek I |
Reach I |
300 |
Phases I-IV; Post-Construction Monitoring |
04C |
Bradford |
Means |
No Permit Issued; USFWS Project |
Bradford
County CD, USFWS |
Unknown |
|
CV, JH, RW |
USFWS |
Gleim Environmental; USFWS |
2001 |
Unknown |
None |
Sugar Creek Stream Restoration, Reach I |
| 31 |
Sugar Creek II |
Reach II |
500 |
Phases I-IV; Post-Construction Monitoring |
04C |
Bradford |
Means |
No Permit Issued; USFWS Project |
Bradford
County CD, USFWS |
Unknown |
|
CV, JH, RW |
USFWS |
Gleim Environmental; USFWS |
2001 |
Unknown |
None |
Sugar Creek Stream Restoration, Reach II |
| 32 |
Sugar Creek, Tributary of Fishing Creek |
N/A |
|
Phase I; Assessment |
09C |
Clinton |
Sattler |
None |
Unknown |
Unknown |
|
Unknown |
Unknown |
Unknown |
Unknown |
Unknown |
None |
Sugar Creek, Tributary of Fishing Creek |
| 33 |
Towanda Creek, Canton Township |
Sites 1, 3, 4 |
1,500 |
Phases I-II; Restoration Plan |
04C |
Bradford |
Means |
No Permit Issued, USFWS Project |
Bradford
County CD, USFWS |
GG 2001, 2002 |
$330,000 |
CV, JH, RW |
USFWS |
Gleim Environmental; USFWS |
N/A |
Unknown |
None |
Towanda Creek, Canton Township (Sites #1, 3, 4) |
| 34 |
Towanda Creek, Mill Creek Tributary |
Site 2 |
400 |
Phases I-II; Restoration Plan |
04C |
Bradford |
Means |
No Permit Issued, USFWS Project |
Bradford
County CD, USFWS |
GG 2001, 2002 |
|
CV, JH |
USFWS |
Gleim Environmental; USFWS |
N/A |
Unknown |
None |
Towanda Creek, Mill Creek Tributary (Site #2) |
| 35 |
White Deer Creek |
N/A |
3,600 |
Phase I; Assessment |
10C |
Union |
Sattler |
None |
White Deer Creek Restoration Committee |
GG 2000, 2001, 2002, 2004 |
$209,275 |
FGM Project Planned |
N/A |
N/A |
N/A |
N/A |
None |
White Deer Creek |
| 36 |
Wyalusing Creek |
Reaches I-II |
6,381 |
Phases I-III; Construction in 2005 |
04D |
Bradford |
Means |
E08-406 |
Wyalusing Creek WA |
GG 1999, 2001 |
$400,000 |
WW, JH, RW |
Hawk Engineering |
Unknown |
2005 |
Wyalusing Creek at Camptown |
None |
Wyalusing Creek (Reach I-II) |
| 37 |
Wysox Creek, Upper Johnson Creek |
Phase I |
2,023 |
Phases I-III; Construction in 2005 |
04D |
Bradford |
Means |
E08-419 |
Wysox Creek WA |
GG 2000, 2001, 2002 |
$250,000 |
CV, JH, RW |
Rivers Unlimited |
Unknown |
2005 |
English Run |
None |
Wysox
Creek, Upper Johnson Creek, Phase I |
| 38 |
Wysox Creek, Lower Johnson Creek |
Phase II |
6,650 |
Phases I-III; Construction in 2005 |
04D |
Bradford |
Means |
E08-419 |
Wysox Creek WA |
GG 2000, 2001, 2002 |
|
CV, JH, LV, RW |
Rivers Unlimited |
Unknown |
2005 |
English Run |
None |
Wysox Creek, Lower Johnson Creek, Phase II |
| 39 |
Wysox Creek, Beaver Creek Tributary |
N/A |
579 |
Phases I-III; Construction in 2005 |
04D |
Bradford |
Means |
E08-419 |
Wysox Creek WA |
GG 2000, 2001, 2002 |
|
CV, JH, LV, RW |
Rivers Unlimited |
Unknown |
2005 |
English Run |
None |
Wysox Creek, Beaver Creek Tributary |
| |
Northcentral Region Totals |
|
79,267 |
|
|
|
|
|
|
|
$4,077,279 |
|
|
|
|
|
|
|
| |
Northcentral Region Averages |
|
4,172 |
|
|
|
|
|
|
|
$239,840 |
|
|
|
|
|
|
|
| · |
Phases: Phase I =
Initial Assessment (Problem Identification); Phase II = Developing a
Restoration Plan;Phase III = Project Design and Permitting; Phase IV =
Construction and Monitoring |
|
|
|
|
|
|
| · |
Project Features: CV =
Cross-Vane (Rock); JH = J-Hook (Rock), WW =
W-Weir (Rock); VW = Vortex Weir (Rock); LV = Log Vane; RW = Root Wad;
FM = Fiber Mat; |
|
|
|
|
|
|
|
|
| |
BE = Bioengineering; RB = Riparian
Buffer (Shrubs & Tree Planting); FH = Fish Habitat (e.g., Boulders); RR =
Riprap; FB = Floodplain Benches; CR = Channel Relocation |
|
|
|
|
|
|
|
| |
MS = Mud Sill;
Bank Grading = BG; Concrete Wall = CW |
|
|
|
|
|
|
|
|
|
| · |
"EA" in Permit
Number = Environmental Assessment; in most cases, no DEP permit was required
or DEP may have issued an "emergency" permit. |
|
|
|
|
|
|
|
*Projects are assumed to
be totally successful if they sustained no damage during bankful events. Projects with some
failure are those where only a few instream |
|
|
|
|
|
|
|
structures were damaged,
projects with moderate failure
are those where about 1/2 of instream structures failed, and projects with total failure are those where very
few |
|
|
|
|
|
|
instream structures
remaining intact or functional.
Information on project success was provided by DEP Watershed Managers,
DEP Regulatory Staff and project
designers. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|