· This is a provisional list of NSCD/FGM projects.  Keys to terms and abbreviations are shown below the table.   Lasted updated: 01/11/2008.                               
· Please send information regarding errors, new project updates, or unlisted projects to database@keystonestreamteam.org        
· This page may not display properly in web browsers other than Internet Explorer.           
               
  PA NORTHCENTRAL REGION - NSCD/FGM PROJECTS                              
# Project or Stream Name Reach or Phase Reach Length (Feet) Project Status Watershed County(ies) DEP Manager DEP Permit # Primary Sponsor/Permittee Funding Source(s) Total Grant Funds Project Features Design Construction Year Built Reference Reach Web Links Project or Stream Name
1 Antes Creek N/A   Phase I; Assessment 10A Lycoming Sattler N/A Greater Nippenose WA Unknown   Unknown N/A N/A N/A N/A None Antes Creek
2 Bentley Creek Reaches I-V 26,928 Phases I-IV; Massive Failure*; Rebuilt in 2000 04B Bradford, Chemung (NY) Means No Permit Issued; USFWS Project Bentley Creek WA GG 1999, 2000, 2002; EPA 319 $300,000 CV, JH, WW USFWS Unknown 1998 Bentley Creek, Bradford County None Bentley Creek (Reach I-V)
3 Big Bear Creek Watershed Restoration Project Reaches I-III 18,375 Phases I-IV; Moderate Failure*; Rebuilt Twice 10B Lycoming Sattler No Permit Issued, USFWS Project Dunwoody Club GG 1999, 2003; WRAP $600,000 CV, JH, LV, RW, FM USFWS Gleim Environmental; USFWS 1999-2000 Ellen Run, Tioga County None Big Bear Creek Watershed Restoration Project (Reach I-III)
4 Black Hole Creek N/A   Phase I; Assessment 10C Lycoming Sattler N/A Black Hole Creek WA & Montgomery Borough GG 2002, 2004 $33,675 N/A N/A N/A N/A N/A None Black Hole Creek
5 Buffalo Run Stream Restoration Project Reaches I-IV 600 Phases I-IV; Completed; Some Failure* 09C Centre Sattler E14-394 Trout Unlimited, Spring Creek Chapter Unknown $102,000 CV, JH, RW, BE, RB, FH Land Studies Unknown 2001 Unknown None Buffalo Run Stream Restoration Project (Reach I-IV)
6 Buffalo Creek N/A   Phase I; Assessment 10C Union Sattler N/A Buffalo Creek WA GG 2001, 2002, 2003 $54,801 N/A N/A N/A N/A N/A None Buffalo Creek
7 Cory Creek A, C, D, E Reaches A, C, D, E   Phases I-II; Need Funding for Design 04A Tioga Means E59-455 Corey Creek WA GG 2002, 2004   Unknown Skelly & Loy Unknown Unknown Mad Run None Cory Creek, Reaches A, C, D, E
8 Cory Creek B Reach B 1,345 Phases I-III; Construction in 2005 04A Tioga Means E59-455 Corey Creek WA GG 2002, 2004   LV, CV, RW Skelly & Loy Unknown Unknown Mill Creek None Cory Creek, Reach B
9 Elk Run Restoration Project N/A   Phases I-IV; Condition Unknown 09A Tioga Means Permit Status Unknown Gaines Township, USFWS GG 2000, 2001   Unknown USFWS, Gannett Fleming Unknown 2001 Unknown None Elk Run Restoration Project
10 Ellen Run Restoration Project N/A 1,006 Phases I-IV; Successful 04A Tioga Means E59-439 Mansfield Boro GG $574,000 CV, JH, RW, RB, FH Skelly & Loy Unknown 2004 Mad Run Ellen Run Ellen Run Restoration Project
11 Fishing Creek, Kocher Park Project N/A 1,800 Phases I-IV; Some Failure*, Needs $70K Repair 07E Columba Sattler No Permit Issued; USFWS Project; E19-242 Fishing Creek WA GG   CV, JH, RW, RB USFWS, Larsen Design Unknown 2004 Unknown None Fishing Creek, Kocher Park Project
12 Fishing Creek, Camp Lavigne Project N/A   Phases I-III; Construction in 2005 07E Columbia Sattler Permit Issued or Pending Boy Scouts of America (BSA) GG   Unknown Larsen Design N/A N/A N/A None Fishing Creek, Camp Lavigne Project
13 Kettle Creek, Headgate Project N/A    Phases I-IV; Condition Unknown 09B Clinton, Potter, Tioga Means E53-376 Kettle Creek WA, Trout Unlimited GG  $100,000 Unknown Unknown Unknown Unknown Unknown None Kettle Creek, Headgate Project
14 Kettle Creek N/A   Phases I-IV; Some Failure* 09B Clinton, Potter, Tioga Means None Kettle Creek WA, Trout Unlimited GG 1999, 2000   Unknown Unknown Unknown Unknown Unknown None Kettle Creek
15 Kettle Creek, Cross Fork N/A   Phases I-III; Design 09B Clinton, Potter, Tioga Means None Kettle Creek WA, Trout Unlimited No GG   Unknown Unknown Unknown Unknown Unknown None Kettle Creek, Cross Fork
16 Lanning Creek N/A   Phases I-III; Design 04D Bradford Means None Lanning Creek WA GG 2002   Unknown Unknown Unknown Unknown Unknown None Lanning Creek
17 Laurel Run & Oliver Run Stream Relocation Project N/A   Phases I-III; Some Failure* 11B Centre Sattler None Unknown Unknown   Unknown Unknown Unknown Unknown Unknown None Laurel Run & Oliver Run Stream Relocation Project
18 Limestone Run N/A   Need Funding for FGM 10D Northumberland Sattler None Unknown No GG for FGM   Unknown Unknown Unknown Unknown GG $23,900 None Limestone Run
19 Lycoming Creek N/A   Phase I, Rosgen II underway 10A Lycoming Sattler None Lycoming Creek WA GG   Unknown Unknown Unknown Unknown Unknown None Lycoming Creek
20 Mahoning Creek Demonstration Project N/A   Phases I-III; Construction in 2005 05E Montour Sattler Permit Status Unknown Unknown Unknown   Unknown Unknown Unknown Unknown Unknown None Mahoning Creek Demonstration Project
21 Mill Creek N/A   Phases I-IV 04C Bradford Means E08-399 & E08400; Split Project Bradford County CD GG   Unknown Unknown Unknown Unknown Unknown None Mill Creek
22 Millers Run Restoration N/A   Phases I-IV, Complete Failure*, Rebuilding 2005 10B Lycoming Sattler E41-499 Loyalsock Township GG 2001, 2004; FEMA 2005   Unknown Unknown Unknown Unknown Unknown None Millers Run Restoration
23 Muncy Creek, Gavitt Site Demonstration Project N/A 500 Phases I-IV, Moderate Failure*, Rebuilt 2005 10D Sullivan Sattler E57-098 Muncy Creek WA GG 2000 $22,528 CV, RV, JH Larsen Design Unknown 2002 None Used None Muncy Creek, Gavitt Site Demonstration Project
24 Muncy Creek, Nordmont to Sonestown Project (Headwaters) N/A 5,280 Phases I-III, Construction in 2005 10D Sullivan Sattler E57-105, Permit Pending Muncy Creek WA GG 2001 $380,500 CV, LV, JH Larsen Design Unknown N/A Grays Run, Lycoming County None Muncy Creek, Nordmont to Sonestown Project (Headwaters)
25 Satterlee Creek, Athens Twp N/A   Phases I-III; NSCD Demo Project Planned 04B Bradford Means None Athens Twp GG 1999, 2001, 2003 $220,500 N/A Unknown N/A N/A Unknown None Satterlee Creek, Athens Twp
26 Sinnemahoning Creek, Bennett Branch Demo Project N/A   Phases I-IV, Successful 08A Cameron Means No Permit Issued; USFWS Project Bennett Branch WA & CVI GG 1999, CVI 1999 $220,000 Unknown USFWS, Gannett Fleming Unknown 2001 Unknown Bennett Branch Sinnemahoning Creek, Bennett Branch Demo Project
27 Sinnemahoning Creek, Clear Creek Tributary, Venture Site N/A 1,000 Phases I-III, Construction in 2005 08A Cameron Means E12-148 Cameron County CD GG 2002, 2003 $225,000 CV, JH, FM Gannett Fleming Unknown N/A Sinnemahoning Creek None Sinnemahoning Creek, Clear Creek Tributary, Venture Site
28 Sinnemahoning Creek, Driftwood Branch, Schatz Site N/A 500 Phases I-III, Construction in 2005 08A Cameron Means E12-148 Cameron County CD GG 2004 $55,000 CV, JH, FM Gannett Fleming Unknown N/A Sinnemahoning Creek None Sinnemahoning Creek, Driftwood Branch, Schatz Site
29 Spring Creek, Tributary to Slab Cabin Run N/A   Phases I-IV; Current Condition Unknown 09C Centre Sattler Permit Status Unknown Penn State University (PSU) 319   Unknown Unknown Unknown Unknown Unknown None Spring Creek, Tributary to Slab Cabin Run
30 Sugar Creek I Reach I 300 Phases I-IV; Post-Construction Monitoring 04C Bradford Means No Permit Issued; USFWS Project Bradford County CD, USFWS Unknown   CV, JH, RW USFWS Gleim Environmental; USFWS 2001 Unknown None Sugar Creek Stream Restoration, Reach I
31 Sugar Creek II Reach II 500 Phases I-IV; Post-Construction Monitoring 04C Bradford Means No Permit Issued; USFWS Project Bradford County CD, USFWS Unknown   CV, JH, RW USFWS Gleim Environmental; USFWS 2001 Unknown None Sugar Creek Stream Restoration, Reach II
32 Sugar Creek, Tributary of Fishing Creek N/A   Phase I; Assessment 09C Clinton Sattler None Unknown Unknown   Unknown Unknown Unknown Unknown Unknown None Sugar Creek, Tributary of Fishing Creek
33 Towanda Creek, Canton Township Sites 1, 3, 4 1,500 Phases I-II; Restoration Plan 04C Bradford Means No Permit Issued, USFWS Project Bradford County CD, USFWS GG 2001, 2002 $330,000 CV, JH, RW USFWS Gleim Environmental; USFWS N/A Unknown None Towanda Creek, Canton Township (Sites #1, 3, 4)
34 Towanda Creek, Mill Creek Tributary Site 2 400 Phases I-II; Restoration Plan 04C Bradford Means No Permit Issued, USFWS Project Bradford County CD, USFWS GG 2001, 2002   CV, JH USFWS Gleim Environmental; USFWS N/A Unknown None Towanda Creek, Mill Creek Tributary (Site #2)
35 White Deer Creek N/A 3,600 Phase I; Assessment 10C Union Sattler None White Deer Creek Restoration Committee GG 2000, 2001, 2002, 2004 $209,275 FGM Project Planned N/A N/A N/A N/A None White Deer Creek
36 Wyalusing Creek Reaches I-II 6,381 Phases I-III; Construction in 2005 04D Bradford Means E08-406 Wyalusing Creek WA GG 1999, 2001 $400,000 WW, JH, RW Hawk Engineering Unknown 2005 Wyalusing Creek at Camptown None Wyalusing Creek (Reach I-II)
37 Wysox Creek, Upper Johnson Creek Phase I 2,023 Phases I-III; Construction in 2005 04D Bradford Means E08-419 Wysox Creek WA GG 2000, 2001, 2002 $250,000 CV, JH, RW Rivers Unlimited Unknown 2005 English Run None Wysox Creek, Upper Johnson Creek, Phase I 
38 Wysox Creek, Lower Johnson Creek Phase II 6,650 Phases I-III; Construction in 2005 04D Bradford Means E08-419 Wysox Creek WA GG 2000, 2001, 2002   CV, JH, LV, RW Rivers Unlimited Unknown 2005 English Run None Wysox Creek, Lower Johnson Creek, Phase II
39 Wysox Creek, Beaver Creek Tributary N/A 579 Phases I-III; Construction in 2005 04D Bradford Means E08-419 Wysox Creek WA GG 2000, 2001, 2002   CV, JH, LV, RW Rivers Unlimited Unknown 2005 English Run None Wysox Creek, Beaver Creek Tributary
  Northcentral Region Totals   79,267               $4,077,279              
  Northcentral Region Averages   4,172               $239,840              
· Phases: Phase I = Initial Assessment (Problem Identification); Phase II = Developing a Restoration Plan;Phase III = Project Design and Permitting; Phase IV = Construction and Monitoring            
· Project Features: CV = Cross-Vane (Rock); JH = J-Hook (Rock), WW =  W-Weir (Rock); VW = Vortex Weir (Rock); LV = Log Vane; RW = Root Wad; FM = Fiber Mat;                
       BE = Bioengineering; RB = Riparian Buffer (Shrubs & Tree Planting); FH = Fish Habitat (e.g., Boulders); RR = Riprap; FB = Floodplain Benches; CR = Channel Relocation              
       MS = Mud Sill; Bank Grading = BG; Concrete Wall = CW                  
· "EA" in Permit Number = Environmental Assessment; in most cases, no DEP permit was required or DEP may have issued an "emergency" permit.            
*Projects are assumed to be totally successful if they sustained no damage during bankful events.  Projects with some failure are those where only a few instream
structures were damaged, projects with moderate failure are those where about 1/2 of instream structures failed, and projects with total failure are those where very few
instream structures remaining intact or functional.  Information on project success was provided by DEP Watershed Managers, DEP Regulatory Staff  and project designers.